Jason over at 37signals talks about the optimum size of a team for the first cut at a project. He says three is the right number.
In the comments, someone mentioned Apple and Amazon keeping teams within two pizza size. For an existing company, I think that is much more realistic though keeping the number down can drastically increase production and development.
Posted by Josh at August 23, 2005 07:19 AM | TrackBack